Layer 01 — Sites and transport

Sites, circuits and the paths between them.

Where every site is, what carries traffic between them, and which of those paths anybody has actually exercised. This is the layer everything else is built on, and the one most often described by a diagram that stopped being true some years ago.

This environment is invented. It was built for these pages and does not describe any client, employer or real estate. Work produced under an engagement belongs to the client who commissioned it and is not republished in any form, redacted or otherwise. This environment is designed to contain the decisions worth discussing, which no single real estate ever does.

Watch it build 4 steps, then it loops.

14 branchessd-wan partialMPLSdual carrierData center AactiveData center BstandbyAWS regiontransit + inspectionAzurevirtual wanDR sitemanaged providerinterconnectdual-carrier MPLSoverlay on some sites onlypath preference untested

How this layer is put together.

Each step adds one part of the design. The last one is usually where the trouble lives.

  1. 01Two data centers, one active and one standby, joined by an interconnect that carries far more than anybody intended when it was built.
  2. 02Fourteen branches reach both data centers over dual-carrier MPLS. Two carriers is the design; whether it is two physical paths is a separate question.
  3. 03An SD-WAN overlay is part-deployed. Some sites use it, some still route production over MPLS only, and both states look identical from the console.
  4. 04Which data center a given branch prefers, and what it does when that data center is the one that failed, is decided by metric arithmetic rather than by anyone's decision.

Transport is the layer people assume is settled. It is usually the layer where the documented design and the running state diverged first, because it changes through carrier work rather than through change control.

Design decisions

5 choices, and what each one costs later.

None of these is a mistake. Each is a defensible trade made with the information available at the time. What they have in common is that the cost arrives somewhere other than where the decision was made — which is why it lands on somebody who was not in the room.

01

Two carriers, or two paths

The decision. Dual-carrier MPLS to every branch, procured separately for resilience.

Why it gets made. Two contracts, two NOCs, two failure domains — genuine resilience on paper, and usually a board-level commitment.

What it costs when it is wrong. Carriers lease from each other. Two circuits can ride the same fibre, the same conduit or the same regional aggregation point, and the first anyone knows is when both fail together. Nobody asks for the physical path diagram until after.

Sites and transport questions →

02

A partial SD-WAN rollout

The decision. The overlay is deployed to some sites and not others, with the remainder scheduled.

Why it gets made. Prove the technology on a subset before committing the estate. Entirely correct as an approach.

What it costs when it is wrong. Two operating models run side by side indefinitely, because the rollout stalls when the sponsor changes. A site can present as overlay-enabled while still forwarding production traffic over MPLS only, and the inventory says it is done.

WAN / SD-WAN Assessment →

03

Hub-and-spoke, or any-to-any

The decision. Branch-to-branch traffic transits a data center rather than going direct.

Why it gets made. One place to inspect, one place to apply policy, one place to troubleshoot. For most estates this is the right call.

What it costs when it is wrong. Branch-to-branch traffic trombones through a data center that may be the one that has failed, and latency-sensitive applications inherit a path nobody measured. The cost appears only when the hub is unavailable, which is the moment it matters.

WAN / SD-WAN Assessment →

04

Which data center a branch prefers

The decision. Preference falls out of routing metrics rather than being set explicitly per site.

Why it gets made. It works, it needs no maintenance, and it has never caused a problem in normal operation.

What it costs when it is wrong. Nobody can state which site a given branch will use, or what happens when that site is down, without reading the tables. During a failover test that question is asked of fourteen sites at once and answered for none of them.

See the boundary this sits on →

05

How the OT segment is treated

The decision. The manufacturing site's operational-technology segment is isolated by policy rather than physically separated.

Why it gets made. Physical separation is expensive and makes legitimate management traffic hard. Policy isolation is the pragmatic middle.

What it costs when it is wrong. Isolation enforced by policy is only as good as every path into the segment, including the ones added later by other teams for good reasons. A segment that must never be reachable usually is, by a route nobody drew.

Network Security →

Continue

The layers connect. That is the point.

Each layer is drawn on the same estate, so a decision taken here shows up as a constraint somewhere else. Reading two of them together is usually more informative than reading either one twice.

Recognize your own estate in this?

Most environments contain several of these decisions. Establishing which ones, and what they are costing, is what an assessment is for.