Home/Solutions
SolutionsStart from the situation, not the product.
Engagements begin with a business situation rather than a platform — a failure nobody can close, a change nobody can approve, or a design nobody can vouch for. This maps each situation to the capability that addresses it and the shortest way to start.
| Business situation | Capability | Where to start |
|---|---|---|
| A critical failure is unresolved across vendors | Cross-domain escalation | Escalation support |
| Leadership cannot prove failover will work | Resiliency architecture | Data Center Failover Assessment |
| Hybrid-cloud paths are unclear or asymmetric | Cloud and network architecture | Cloud Connectivity Assessment |
| Security intent differs from what is enforced | Security architecture | Palo Alto Security Assessment |
| A major migration carries unacceptable outage risk | Architecture assurance | AWS Network Architecture Assessment |
| F5, firewall, routing and application teams disagree | End-to-end transaction analysis | Escalation support |
| Growth or acquisition produced incompatible designs | Integration architecture | Discovery and target-state design |
| Access control behaves differently across the estate | Identity and access architecture | Cisco ISE Assessment |
If the symptom does not map cleanly, that is normal. An application problem can originate at the load balancer, the firewall, a cloud security group, routing, the backend or the application itself. Establishing which is part of the work rather than a prerequisite for it.
Engagement model
Engage at one stage, or across the whole lifecycle.
Assess→
Design→
Remediate→
Implement→
Document→
Optimize
| Stage | What happens |
|---|---|
| Assess | Establish the current state from evidence, and rank what is wrong by consequence. |
| Design | Define a target architecture appropriate to the organization that has to operate it. |
| Remediate | Correct what the assessment found, in an order that keeps the environment supportable. |
| Implement | Execute the design and validate it, including the failure behavior where it is safe to do so. |
| Document | Produce the diagrams, registers, runbooks and procedures the environment needs afterwards. |
| Optimize | Revisit against changed requirements, and keep the record current rather than letting it drift. |
Describe the symptom.
We will tell you which capability it sits in, and whether an assessment is the right next step.